沙龙会sa36

Temperature control equipment for high and low temperature loading platforms

It mainly consists of refrigeration system, circulation system, control system, box, etc. The refrigeration system adopts steam compression refrigeration, and the compressor and main refrigeration components are all from internationally renowned brands. The circulation system consists of a circulation pump, an electric heater, an expansion vessel, an exhaust valve, a one-way valve, a thermal resistor, and circulation pipelines. The control system adopts PID control technology, high-definition touch screen display, and is equipped with multiple protection functions to ensure the safe operation of the equipment. By cooling and heating the unit itself, the heat carrying fluid is transported to the outside world to meet the requirements of the process conditions.

Fully enclosed system: Adopting a fully enclosed system design, the entire circulation pipeline only has breathing holes left on the filling cap, and the heat transfer oil will not directly come into contact with the air, extending the service life of the heat transfer oil while ensuring the stability of system operation. The expansion oil tank is always kept at room temperature, without oil mist generated at high temperatures, and will not frost at low temperatures.
Temperature control system: A self-developed temperature control module that changes the control setting method to quickly respond to system lag during the process and obtain the minimum temperature overshoot. The control consists of two sets of PID (each set of PID is variable) control loops, which become the main loop and the slave loop. The control output of the main loop serves as the set value of the slave loop. The system adopts a feedforward PV, and the output of the PID operation result of the main control circuit is combined with the feedforward PV signal as the set value of the main control circuit. By doing so, gradient control of temperature changes is carried out to ensure the temperature accuracy of the system.
Efficient heat exchange system: The system adopts pipeline heating and cooling, with very little liquid participating in circulation. Plate heat exchangers are used for refrigeration, which have high heat exchange efficiency and compact structure. Pipeline flange heaters are used for heating, and the volume of the entire system (plate heat exchanger volume+pipeline heat exchanger volume+circulation pump internal volume+circulation pipeline volume).
Control repeatability: Based on advanced dynamic control systems, consistent control results can be achieved every time, greatly improving the stability of product production.
Product Appearance: The appearance design draws on the design concept of imported foreign products, using a large caliber quartz glass level gauge. The level gauge and operation screen are placed on the same side for easy observation, simple and fashionable style, coordinated layout, and exclusive color matching.
Ultra high temperature cooling technology: Adopting ultra-high temperature cooling technology, it can directly start the compressor for cooling at a maximum temperature of 300 ℃.
Quality assurance

Consult immediately

沙龙会sa36(国际)官方网站 沙龙会sa36(国际)官方网站 沙龙会sa36(国际)官方网站

Product recommendations

OUR
SERVICE

service

PROTECO

Proteco Services

沙龙会sa36(国际)官方网站

Free door-to-door delivery nationwide: The delivery time varies from 5-7 days in various provinces of northwest, northeast, and southwest. Due to uncertain factors, the delivery time in some places is more than 7 days, while in other provinces it is 3-5 days. The delivery time in Jiangsu, Zhejiang, and Shanghai is 1-2 days

沙龙会sa36(国际)官方网站

We do not make any promises regarding transportation time. In the event of holidays, rain, snow, heavy fog, etc., there may be occasional delays in logistics transportation, which is beyond the manufacturer's control. Please understand.

  • 沙龙会sa36(国际)官方网站Complete order
  • 沙龙会sa36(国际)官方网站Print invoice
  • 沙龙会sa36(国际)官方网站Packaging and packing
  • 沙龙会sa36(国际)官方网站Free logistics
  • 沙龙会sa36(国际)官方网站Free installation/debugging
沙龙会sa36(国际)官方网站 Ask

QQ

2880680455

Telephone

182 2161 6900

【网站地图】【sitemap】